Posted on Saturday 13 November 2010
A construction crew in the south-central Chinese city of Changsha has completed a 15-story hotel in just six days.
Six days. That’s how long it took to build this level 9 Earthquake-resistant, sound-proofed, thermal-insulated 15-story hotel in Changsha, complete with everything, from the cabling to three-pane windows. The foundations were already built, but it’s just impressive.
Despite the frenetic pace of construction, no workers were injured — and thanks to the prefab nature of the process, the builders wasted very few construction materials.
Below is a time-lapse video that shows the hotel being built from the ground up in less than a week:




A statue of Jesus Christ that its builders say will be the largest in the world is fast rising from a Polish cabbage field and local officials hope it will become a beacon for tourists.